
DSEAR Risk Assessment: Do You Need One as Well as COSHH?
Do you need a DSEAR risk assessment as well as COSHH? What DSEAR covers on site, what the assessment must include and how it fits into your RAMS and permits.
Built with UK health & safety regulations in mind
Get the latest RAMS insights, compliance updates, and health & safety tips delivered to your inbox.
Ready to generate professional RAMS documents in seconds? Try our AI-powered platform free.
14-day free trial · No card needed
Browse by topic

Do you need a DSEAR risk assessment as well as COSHH? What DSEAR covers on site, what the assessment must include and how it fits into your RAMS and permits.

How a 5x5 risk assessment matrix works: likelihood x severity, scoring before and after controls, 3x3 vs 5x5, worked UK site examples and common mistakes.

The hierarchy of control explained for UK sites: elimination, substitution, engineering, admin controls and PPE, with ERIC-PD and worked RAMS examples.

What counts as temporary works, who is responsible under CDM 2015, whether you need a temporary works coordinator and what to write into your RAMS.

What makes a competent person in health and safety under MHSWR and CDM 2015, when to use outside help, and who should review and approve a RAMS on your site.

The Management of Health and Safety at Work Regulations 1999 explained: risk assessment, competent persons, training, young workers and pregnant workers.

What does a banksman do and when do you need one? A practical UK guide to reversing vehicles, the law, signals, training and writing it into your RAMS.

How to carry out a first aid needs assessment under the 1981 Regulations and HSE L74: appointed persons, first-aider numbers, kits and remote or shared sites.

Who must keep an accident book, what each entry needs, how long to keep it, data protection and how it links to RIDDOR. A plain UK guide for site and FM teams.

The Noise at Work Regulations 2005 explained for UK sites: the 80, 85 and 87 dB(A) values, peak limits, hearing protection zones and health surveillance.

Who needs a legionella risk assessment, what ACOP L8 and HSG274 expect, the key water temperatures and checks, and how to plan the maintenance work after it.

What a near miss is, real examples from UK sites, when a near miss becomes a RIDDOR dangerous occurrence, and a simple way to report and learn from them.