2026 Comparison

Best Method Statement Software UK

5 ways to create method statements compared. From AI generation to templates to consultants. Which approach fits your workflow?

The shortlist

  1. 1

    swiftRMS

    Included in every plan · 14-day free trial, then from £49/mo

  2. 2

    HandsHQ

    From £44/mo (1 RAMS a month)

  3. 3

    SiteDocsPro

    From £39/mo

  4. 4

    Word/Excel Templates

    Free

  5. 5

    H&S Consultant

    £200-400 per document

The basics

What Must a Method Statement Include?

  • Sequence of operations

    A chronological, step-by-step breakdown of every activity from mobilisation to demobilisation. Each step should be specific enough that a competent operative can follow it without ambiguity.

  • Hazards at each step

    The specific hazards present at each stage of the work. These should be linked to the risk assessment but provide additional detail on when and how hazards arise during the work sequence.

  • Control measures per step

    The specific controls that must be in place before each step begins. This includes permits, isolation, PPE, exclusion zones, and any monitoring required.

  • Responsible persons

    Who is responsible for each step, who supervises, and who has authority to stop work. Names or roles should be specified.

  • Emergency procedures

    What to do if something goes wrong at each critical stage. Includes rescue plans for confined space and work at height, first aid provision, and incident reporting.

  • Competency requirements

    What qualifications, training, or experience are needed for each task. This includes trade certifications, CSCS cards, specific training (e.g., confined space), and any supervision requirements.

Side by side

Feature Comparison

swiftRMS

RECOMMENDED
Pricing
Included in every plan · 14-day free trial, then from £49/mo
Speed
AI-generated in 2 minutes
Step-by-Step Procedures
Step-by-Step Procedures: yes
Hazards Per Step
Hazards Per Step: yes
Linked to Risk Assessment
Linked to Risk Assessment: yes
Legislation Auto-Cited
Legislation Auto-Cited: yes
PDF Export
PDF Export: yes
Team Collaboration
Team Collaboration: yes

HandsHQ

Pricing
From £44/mo (1 RAMS a month)
Speed
Template-based (15-30 min)
Step-by-Step Procedures
Step-by-Step Procedures: yes
Hazards Per Step
Hazards Per Step: yes
Linked to Risk Assessment
Linked to Risk Assessment: yes
Legislation Auto-Cited
Legislation Auto-Cited: yes
PDF Export
PDF Export: yes
Team Collaboration
Team Collaboration: yes

SiteDocsPro

Pricing
From £39/mo
Speed
Template-based (20-40 min)
Step-by-Step Procedures
Step-by-Step Procedures: yes
Hazards Per Step
Hazards Per Step: no
Linked to Risk Assessment
Linked to Risk Assessment: yes
Legislation Auto-Cited
Legislation Auto-Cited: no
PDF Export
PDF Export: yes
Team Collaboration
Team Collaboration: yes

Word/Excel Templates

Pricing
Free
Speed
Manual (2-4 hours)
Step-by-Step Procedures
Step-by-Step Procedures: no
Hazards Per Step
Hazards Per Step: no
Linked to Risk Assessment
Linked to Risk Assessment: no
Legislation Auto-Cited
Legislation Auto-Cited: no
PDF Export
PDF Export: yes
Team Collaboration
Team Collaboration: no

H&S Consultant

Pricing
£200-400 per document
Speed
2-7 business days
Step-by-Step Procedures
Step-by-Step Procedures: yes
Hazards Per Step
Hazards Per Step: yes
Linked to Risk Assessment
Linked to Risk Assessment: yes
Legislation Auto-Cited
Legislation Auto-Cited: yes
PDF Export
PDF Export: yes
Team Collaboration
Team Collaboration: no

Tool by tool

Tool Reviews

  1. 1. swiftRMS

    BEST OVERALL

    AI-powered SSOW (Safe System of Work) generator that creates step-by-step method statements from a task description. Each step includes the activity, hazards, controls, and responsible person. Linked to parent RAMS for full documentation coherence.

    AI-generated in 2 minutesIncluded in every plan · 14-day free trial, then from £49/mo
  2. 2. HandsHQ

    RAMS software with method statement capability. Template-driven with a library of pre-built steps. UK-focused with construction industry knowledge.

    Template-based (15-30 min)From £44/mo (1 RAMS a month)
  3. 3. SiteDocsPro

    Cloud-based construction documentation platform. Method statements created from templates with drag-and-drop step builders.

    Template-based (20-40 min)From £39/mo
  4. 4. Word/Excel Templates

    Free downloadable method statement templates. Blank documents requiring manual completion of every field. No automation, no hazard library, no legislation database.

    Manual (2-4 hours)Free
  5. 5. H&S Consultant

    External consultants write bespoke method statements. High quality but slow and expensive. Best for complex or novel procedures.

    2-7 business days£200-400 per document

FAQ

Method Statement FAQs

What is the difference between a method statement and a risk assessment?

A risk assessment identifies hazards and evaluates the risk level with and without controls. A method statement (or Safe System of Work) describes the step-by-step procedure for carrying out the work safely. Together they form a RAMS document: the risk assessment answers 'what could go wrong and how do we prevent it' while the method statement answers 'how do we actually do the work safely'. Both are legally required under the Management of Health and Safety at Work Regulations 1999. RAMS software like swiftRMS generates both the risk assessment and method statement together.

Is a method statement a legal requirement?

The Management of Health and Safety at Work Regulations 1999 require employers to have arrangements for the effective planning, organisation, control, monitoring, and review of preventive and protective measures. A method statement is the standard way to document these arrangements for construction and maintenance work. While the term 'method statement' is not used in legislation, the requirement for a documented safe system of work is established in law.

How detailed should a method statement be?

Detailed enough that a competent operative can follow the procedure safely without additional verbal instruction. Each step should describe the activity, the hazards present at that stage, the controls that must be in place, and who is responsible. Avoid generic statements like 'work safely'. Instead, specify the exact control: 'install edge protection to all open edges before commencing roof work'.

Can I use the same method statement for every job?

No. Method statements must be site-specific and task-specific. The sequence of work, the hazards, and the controls will differ between sites even for the same type of work. A method statement for a domestic boiler installation is different to one for a commercial plant room, even though the core task is similar.

Generate method statements in 2 minutes

swiftRMS creates step-by-step method statements with hazards and controls at each stage. Free to try, no signup; 14-day trial, no card needed.